• Changing RCF's index page, please click on "Forums" to access the forums.

Progressive Field Renovations Planned Over 2 Years

Do Not Sell My Personal Information
I'm confused did they deviate from the plan or is it just not finished?
They have not been as informative as the Browns were with updates. Is there a clear distinction of what has been done and what still need to be done? The answer seems to be no. Seems like the PR department has dropped the ball, and I can't say it is a huge surprise. Was also curious to know if they have finally updated the TV's to all HD and flat screens. Having analog TV;s from the 90's was shocking to me when I went to a game in 2013. Just assumed all ball parks had updated to that point.
This pick looks bad.

 
Last edited:
I guess people just ignore the 2 year part of this.

Probably not enough time to finish it this year.
 
I never understood why everything was green. I don't get why the chairs and walls weren't blue with red trim.
 
I'm impressed by all the people here who like to paint aluminum when average temperature is in the 40s with nighttime lows in the 30s. And a pretty wet spring so far. But eh what do I know? Clearly their goal was to paint 10% of it green n then leave the rest white. Cheap Dolanz!!
 
I'm impressed by all the people here who like to paint aluminum when average temperature is in the 40s with nighttime lows in the 30s. And a pretty wet spring so far. But eh what do I know? Clearly their goal was to paint 10% of it green n then leave the rest white. Cheap Dolanz!!

I don't like to wake up at 5:30, sit in shit ass Atlanta traffic for an hour and a half and rot away in a soul crushing cubicle for 8.5 hours, but I do it for a paycheck and because the McMuffins don't make themselves. I'm sure the workers aren't volunteering their time to get the stadium ready by Friday.
 
Last edited:
I don't like to wake up at 5:30, sit in shit ass Atlanta traffic for an hour and a half and rot away in a soul crushing cubicle for 8.5 hours, but I do it for a paycheck and because the McMuffins don't make themselves. I'm sure the workers aren't volunteering their time to get the stadium ready by Friday.
I'm referencing the weather in regards to the actual paint adhering not the workers.
And I bet the only thing they have to do halfway through a two renovation is paint too, right? But again, what ev.
 
Dude, stop trying to make the Dolanz not look cheap.

We all know they'll never spend or keep their own players. Ever. :chuckle:
 
Can't wait to get down to the park.
Gonna be a crazy year. Hopefully the fans will bring the energy.
 
As much as it pains me to say it, the boxes look better with ads on them. Even if it's just a marginal difference.

They need to make an effort to dress those up a little bit.
 
I must have missed where this:
neighborhoods.jpg

Looks like this:

CB7YClkUkAE_DT3.jpg
 

Rubber Rim Job Podcast Video

Episode 3-14: "Time for Playoff Vengeance on Mickey"

Rubber Rim Job Podcast Spotify

Episode 3:14: " Time for Playoff Vengeance on Mickey."
Top